Product image

Please wait...

Product image

Please wait...

Login


Not registered yet?

Sign in now and benefit from the advantages of the Siegmund portal.

Register

Account not activated yet?

You can activate your user account here. You have received a code for this via email.

Activate now

Herz Energietechnik GmbH

You can see the production of a wood gasifier boiler for logs and wood briquets. The boiler is built on a Siegmund table with shortened table legs, since most of the welding work during the production process takes place in the upper part of the workpiece.

To be able to work effectively and quickly, cast iron squares matched to the size of the boiler, are clamped on the table. Assisted by magnetic clamping bolts the exterior sheeting of the boiler is clamped within seconds, and can be tacked together after just a few hand grips.

The dimensions of a boiler are 1,400 x 600 x 1,400 mm, weighing 515 kg.

Industry icon steel metal construction

Sector

Steel, sheet metal and metal construction


Icon Location

Location

Pinkafeld (AT)


Icon Products

Products

Welding Table – System 28


To the products