Illustrations show production of a special container, serving as a collection tank for bore fluids. It is used in civil engineering to boreholes for foundation posts. The accumulated bore fluid is collected in it and cleaned. To stabilize the borehole, the bore fluid is pumped back afterward.
By using Siegmund tables no templates or devices have to be produced, reducing low volume production time by 20–25%.
The container weighs 6.4 tons and is 10 m wide, approx. 2.5 m deep and 2.5 m high.
Sector
Steel, sheet metal and metal construction
Location
Kaufbeuren (DE)
Products
Welding Table – System 28
Supplementary or accompanying content from "YouTube" is provided in this area. You can show and hide this content with one click.
I agree that I want to show external content. This can lead to personal data being passed on to third party platforms.
More information about Cookies and social-media-plugins can be found in our Data Protection Declaration.